Research Article | Open Access | Download PDF
Volume 13 | Issue 5 | Year 2026 | Article Id. IJCE-V13I5P111 | DOI : https://doi.org/10.14445/23488352/IJCE-V13I5P111BIM-Based Construction Project Supported by an Integrated Project Delivery Contract Model for Building Energy Efficiency
Chan Yong Yeah, Wesam Salah Alaloul, Muhammad Ali Musarat, Socheatra Soeung
| Received | Revised | Accepted | Published |
|---|---|---|---|
| 23 Oct 2025 | 06 Nov 2025 | 18 Apr 2026 | 29 May 2026 |
Citation :
Chan Yong Yeah, Wesam Salah Alaloul, Muhammad Ali Musarat, Socheatra Soeung, "BIM-Based Construction Project Supported by an Integrated Project Delivery Contract Model for Building Energy Efficiency," International Journal of Civil Engineering, vol. 13, no. 5, pp. 149-171, 2026. Crossref, https://doi.org/10.14445/23488352/IJCE-V13I5P111
Abstract
Buildings are responsible for a significant share of the world’s energy use and carbon emissions. Traditional project delivery methods do not help much in improving overall performance in this regard. This is where the introduction of Building Information Modelling (BIM) with Integrated Project Delivery (IPD) comes into its own, as they provide a far more collaborative and efficient way of tackling not only environmental concerns but also economic and social ones by streamlining the design process. This Article examines how the two approaches have shaped energy efficiency in buildings over the last 10 years, from 2014 to 2024. Using the PRISMA approach, 102 papers were extracted from reputable databases such as ASCE, Emerald, Scopus, and ScienceDirect. Attention was given to the influence of BIM and IPD on project management, precast construction methodologies, and building energy. These two systems are similar in that they can be used as multiple-feature systems. A SWOT analysis facilitated an overall assessment of how BIM-led projects under the IPD model can deliver better energy outcomes. From all of this, the study offers a conceptual model illustrating how BIM and IPD, combined, represent a formidable strategy for designing and realising more energy-efficient buildings.
Keywords
Project Delivery, Energy Efficiency, Building Projects, IPD, BIM, Construction.
References
- F.H. Abanda et al., “A Study of the Potential of Cloud/Mobile BIM for the Management of Construction Projects,” Applied System Innovation, vol. 1, no. 2, pp. 1-19, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - M. Abedi et al., “Integrated Collaborative Tools for Precast Supply Chain Management,” Scientia Iranica, vol. 23, no. 2, pp. 429-448, 2016.
[CrossRef] [Google Scholar] [Publisher Link] - Irtishad Ahmad et al., “Enhancement of IPD Characteristics as Impelled by Information and Communication Technology,” Journal of Management in Engineering, vol. 35, no. 1, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Zohari Akob et al., “Deployment of GIS + BIM in the construction of Pan Borneo Highway Sarawak, Malaysia,” IOP Conference Series: Materials Science and Engineering: 10th Malaysian Road Conference & Exhibition, Selangor, Malaysia, pp. 1-11, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Hande Aladag, Gökhan Demirdögen, and Zeynep Isık, “Building Information Modeling (BIM) Use in Turkish Construction Industry,” Procedia Engineering, vol. 161, pp. 174-179, 2016.
[CrossRef] [Google Scholar] [Publisher Link] - Ahmed K. Ali, and Ralph Badinelli, “Novel Integration of Sustainable and Construction Decisions into the Design Bid Build Project Delivery Method Using BPMN,” Procedia Engineering, vol. 145, 164-171, 2016.
[CrossRef] [Google Scholar] [Publisher Link] - Zaid Alwan, David Greenwood, and Barry Gledson, “Rapid LEED Evaluation performed with BIM based Sustainability Analysis on a Virtual Construction Project,” Construction Innovation, vol. 15, no. 2, pp. 134-150, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Ando Andriamamonjy, Dirk Saelens, and Ralf Klein, “An Automated IFC-based Workflow for Building Energy Performance Simulation with Modelica,” Automation in Construction, vol. 91, pp. 166-181, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Mark Kyeredey Ansah et al., “Developing an Automated BIM-based Life Cycle Assessment Approach for Modularly Designed High-rise Buildings,” Environmental Impact Assessment Review, vol. 90, pp. 1-38, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Yusuf Arayici et al., “Interoperability Specification Development for Integrated BIM use in Performance based Design,” Automation in Construction, vol. 85, pp. 167-181, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Senay Atabay et al., “Incorporating BIM and Green Building in Engineering Education: Assessment of a School Building for LEED Certification,” Practice Periodical on Structural Design and Construction, vol. 25, no. 4, pp. 1-11, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Avirag Bajpai, and Subhas C. Misra, “Evaluation of Success Factors to Implement Digitalization in the Construction Industry,” Construction Innovation, vol. 24, no. 4, pp. 865-891, 2024.
[CrossRef] [Google Scholar] [Publisher Link] - Fernanda S. Bataglin et al., “Model for Planning and Controlling the Delivery and Assembly of Engineer-to-order Prefabricated Building Systems: Exploring Synergies between Lean and BIM,” Canadian Journal of Civil Engineering, vol. 47, no. 2, pp. 165-177, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Lee Huan Boon et al., “Building Information Modelling Integrated Project Delivery System in Malaysia,” Malaysian Construction Research Journal, vol. 6, no. S1, pp. 144-152.
[Google Scholar] - Shanshan Bu et al., “Literature Review of Green Retrofit Design for Commercial Buildings with BIM Implication,” Smart and Sustainable Built Environment, vol. 4, no. 2, pp. 188-214, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Dongping Cao et al., “Practices and Effectiveness of Building Information Modelling in Construction Projects in China,” Automation in Construction, vol. 49, pp. 113-122, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Hasan Burak Cavka, Sheryl Staub-French, and Erik A. Poirier, “Developing Owner Information Requirements for BIM-enabled Project Delivery and Asset Management,” Automation in Construction, vol. 83, pp. 169-183, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Baoquan Cheng et al., “Improving Contractors’ Participation of Resource Utilization in Construction and Demolition Waste through Government Incentives and Punishments,” Environmental Management, vol. 70, pp. 666-680, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - Prasenjit Dalui et al., “Integrated Project Delivery with BIM: A Methodical Approach Within the UK Consulting Sector,” Journal of Information Technology in Construction, vol. 26, pp. 922-935, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Amos Darko et al., “Building Information Modeling (BIM)-based Modular Integrated Construction Risk Management – Critical Survey and Future Needs,” Computers in Industry, vol. 123, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Yanchao Du et al., “Exploring the Moral Hazard Evolutionary Mechanism for BIM Implementation in an Integrated Project Team,” Sustainability, vol. 11, no. 20, pp. 1-28, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Serdar Durdyev et al., “Barriers to the use of Integrated Project Delivery (IPD): A Quantified Model for Malaysia,” Engineering, Construction and Architectural Management, vol. 27, no. 1, pp. 186-204, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Tamer El-Diraby et al., “BIM-based Collaborative Design and Socio-technical Analytics of Green Buildings,” Automation in Construction, vol. 82, pp. 59-74, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Faris Elghaish, and Sepehr Abrishami, “Developing a Framework to Revolutionise the 4D BIM Process: IPD-based Solution,” Construction Innovation, vol. 20, no. 3, pp. 401-420, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Faris Elghaish et al., “Integrated Project Delivery with Blockchain: An Automated Financial System,” Automation in Construction, vol. 114, pp. 1-50, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Faris Elghaish et al., “Revolutionising Cost Structure for Integrated Project Delivery: A BIM-based Solution,” Engineering, Construction and Architectural Management, vol. 28, no. 4, pp. 1214-1240, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Faris Elghaish et al., “Integrated Project Delivery with BIM: An Automated EVM-based Approach,” Automation in Construction, vol. 106, pp. 1-44, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Faris Elghaish et al., “Factors Driving Success of Cost Management Practices in Integrated Project Delivery (IPD),” Sustainability, vol. 12, no. 22, pp. 1-14, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Andrews Erazo, Giankeving Guzman, and Stefany Espinoza, “Applying BIM Tools in IPD Project in Peru,” 28th Annual Conference of the International Group for Lean Construction (IGLC), Berkeley, California, USA, pp. 973-984, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Martin Evans et al., “Barriers to Integrating Lean Construction and Integrated Project Delivery (IPD) on Construction Megaprojects Towards the Global Integrated Delivery (GID) in Multinational Organisations: Lean IPD&GID Transformative Initiatives,” Journal of Engineering, Design and Technology, vol. 21, no. 3, pp. 778-818, 2023.
[CrossRef] [Google Scholar] [Publisher Link] - A.H. Fakhimi, J. Majrouhi Sardroud, and S. Azhar, “How Can Lean, IPD and BIM Work Together?,” 2016 Proceedings of the 33rd ISARC, Auburn, USA, pp. 67-75, 2016.
[CrossRef] [Google Scholar] [Publisher Link] - Hao Gao, Christian Koch, and Yupeng Wu, “Building Information Modelling based Building Energy Modelling: A Review,” Applied Energy, vol. 238, pp. 320-343, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Tristan Gerrish et al., “Using BIM Capabilities to Improve Existing Building Energy Modelling Practices,” Open Access. Engineering, Construction and Architectural Management, vol. 24, no. 2, pp. 190-208, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Tristan Gerrish et al., “BIM Application to Building Energy Performance Visualisation and Management: Challenges and Potential,” Energy and Buildings, vol. 144, pp. 218-228, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Ifechukwu Gil-Ozoudeh et al., “The Role of Passive Design Strategies in Enhancing Energy Efficiency in Green Buildings,” Engineering Science & Technology Journal, vol. 3, no. 2, pp. 71-91, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - K. Govender et al., “The Awareness of Integrated Project Delivery and Building Information Modelling - Facilitating Construction Projects,” International Journal of Sustainable Development and Planning, vol. 13 no. 1, pp. 121-129, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Beata Grzyl, Emilia Miszewska-Urbańska, and Magdalena Apollo, “Building Information Modelling as an Opportunity and Risk for Stakeholders Involved in Construction Investment Process,” Procedia Engineering, vol. 196, pp. 1026-1033, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Heikki Halttula, Harri Haapasalo, and Maila Herva, “Barriers to Achieving the Benefits of BIM,” International Journal of 3-D Information Modeling (IJ3DIM), vol. 4, no. 4, pp. 16-33, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Noraini Hamzah et al., “A CMMS Expert using BIM for IBS Building Maintenance,” MATEC Web of Conferences, vol. 66, pp. 1-10, 2016.
[CrossRef] [Google Scholar] [Publisher Link] - Ziqi Hao, Wensheng Zhang, and Yunche Zhao, “Integrated BIM and VR to Implement IPD Mode in Transportation Infrastructure Projects: System Design and Case Application,” PLoS One, vol. 16, no. 11, pp. 1-26, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Curtis Harrison, and Derek Thurnell, “Bim Implementation in a New Zealand Consulting Quantity Surveying Practice,” International Journal of Construction Supply Chain Management, vol. 5, no. 1, pp. 1-15, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Abdulrahman Haruna, Nasir Shafiq, and O.A. Montasir, “Building Information Modelling Application for Developing Sustainable Building (Multi Criteria Decision Making Approach),” Ain Shams Engineering Journal, vol. 12, no. 1, pp. 293-302, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Eilif Hjelseth, BIM Understanding and Activities, WIT Transactions on the Built Environment, vol. 169, pp. 3-14, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Ayodele Emmanuel Ikudayisi et al., “Integrated Design Process of Green Building Projects: A Review towards Assessment Metrics and Conceptual Framework,” Journal of Building Engineering, vol. 50, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - Juan Jin, Kyung-Eun Hwang, and Inhan Kim, “A Study on the Constructivism Learning Method for BIM/IPD Collaboration Education,” Applied Sciences, vol. 10, no. 15, pp. 1-25, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Ruoyu Jin et al., “Integrating BIM with Building Performance Analysis in Project Life-cycle,” Automation in Construction, vol. 106, pp. 1-22, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Ruoyu Jin et al., “Scientometric Analysis of BIM-based Research in Construction Engineering and Management,” Engineering, Construction and Architectural Management, vol. 26, no. 8, pp. 1750-1776, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Barry Jones, “Integrated Project Delivery (IPD) for Maximizing Design and Construction Considerations Regarding Sustainability,” Procedia Engineering, vol. 95, pp. 528-538, 2014.
[CrossRef] [Google Scholar] [Publisher Link] - Zahra Kahvandi et al., “Integrated Project Delivery Implementation Challenges in the Construction Industry,” Civil Engineering Journal, vol. 5, no. 8, pp. 1672-1683, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Taha Karasu, Kirsi Aaltonen, and Harri Haapasalo, “The Interplay of IPD and BIM: A Systematic Literature Review,” Construction Innovation, vol. 23, no. 3, pp. 640-664, 2023.
[CrossRef] [Google Scholar] [Publisher Link] - Mohamad Kassem et al., “BIM in Facilities Management Applications: A Case Study of a Large University Complex,” Built Environment Project and Asset Management, vol. 5, no. 3, pp. 261-277, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Iman Kiani et al., “Barriers to Implementation of Building Information Modeling in Scheduling and Planning Phase in Iran,” Australian Journal of Basic and Applied Sciences, vol. 9, no. 5, pp. 91-97, 2015.
[Google Scholar] [Publisher Link] - Judy A. Kraatz, Adriana X. Sanchez, and Keith D. Hampson, “Digital Modeling, Integrated Project Delivery and Industry Transformation: An Australian Case Study,” Buildings, vol. 4, no. 3, pp. 453-466, 2014.
[CrossRef] [Google Scholar] [Publisher Link] - Dana Kralisch et al., “The Need for Innovation Management and Decision Guidance in Sustainable Process Design,” Journal of Cleaner Production, vol. 172, pp. 2374-2388, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Hyun-ah Kwon, and Soomi Kim, “Designing for Modern Living: The Strategic Evolution of Residential Spaces in Response to Improved Lifestyles,” Technical Bulletin, vol. 18, no. 2, pp. 234-245, 2024.
[CrossRef] [Google Scholar] [Publisher Link] - Thep Thanh Lam, Lamine Mahdjoubi, and Jim Mason, “A Framework to Assist in the Analysis of Risks and Rewards of Adopting BIM for SMEs in the UK,” Journal of Civil Engineering and Management, vol. 23, no. 6, pp. 740-752, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Vikrom Laovisutthicha, Weisheng Lu, and Zhikang Bao, “Design for Construction Waste Minimization: Guidelines and Practice,” Architectural Engineering and Design Management, vol. 18, no. 3, pp. 279-298, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - Joosung Lee, Byeol Kim, and Yonghan Ahn, “Building Information Modeling (BIM) Technology Education for the Needs of Industry in Developing Countries,” International Journal of Engineering Education, vol. 35, no. 1, pp. 126-141, 2019.
[Google Scholar] [Publisher Link] - Tai-Yu Lin et al., “Renewable Energy Consumption Efficiency, Greenhouse Gas Emission Efficiency, and Climate Change in Europe,” Geoenergy Science and Engineering, vol. 247, 2025.
[CrossRef] [Google Scholar] [Publisher Link] - Fangxiao Liu et al., “A Framework for Integrating Change Management with Building Information Modeling,” Proceedings Computing in Civil and Building Engineering, pp. 439-446, 2014.
[CrossRef] [Google Scholar] [Publisher Link] - Yan Liu et al., “Sustainable Infrastructure Design Framework through Integration of Rating Systems and Building Information Modeling,” Advances in Civil Engineering, vol. 2018, pp. 1-13, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Yujie Lu et al., “Building Information Modeling (BIM) for Green Buildings: A Critical Review and Future Directions,” Automation in Construction, vol. 83, pp. 134-148, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Yupeng Luo, and Wei Wu, “Sustainable Design with BIM Facilitation in Project-based Learning,” Procedia Engineering, vol. 118, pp. 819-826, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Liang Ma et al., “Regional Comparisons of Contemporary Construction Industry Sustainable Concepts in the Chinese Context,” Sustainability, vol. 10, no. 11, pp. 1-17, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Mohammed N. Maliha, Bassam A. Tayeh, and Yazan I. Abu Aisheh, “Building Information Modeling (BIM) in Enhancing the Applying of Knowledge Areas in the Architecture, Engineering and Construction (AEC) Industry,” The Open Civil Engineering Journal, vol. 14, pp. 388-401, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Sebastiano Maltese et al., “Sustainability Assessment through Green BIM for Environmental, Social and Economic Efficiency,” Procedia Engineering, vol. 180, pp. 520-530, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - M. Manca et al., “Building Circular Economy: a Case Study Designed and Built Following a BIM-Based Life Cycle Assessment Approach,” Proceedings of the 15th International Conference on Durability of Building Materials and Components, DBMC 2020, Barcelona, pp. 1-9, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Tingting Mei et al., “Rent-Seeking Behavior of BIM- and IPD-based Construction Project in China,” Engineering, Construction and Architectural Management, vol. 24, no. 3, pp. 514-536, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Qingfeng Meng et al., “A Review of Integrated Applications of BIM and Related Technologies in Whole Building Life Cycle,” Engineering, Construction and Architectural Management, vol. 27, no, 8, pp. 1647-1677, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Hung V. Nguyen, Iris D. Tommelein, and Paul Martin, “Process-Based Cost Modeling Framework and Case Study,” 26th Annual Conference of the International Group for Lean Construction, Chennai, India, pp. 46-57, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Vladimír Nývlt, “The Role of Managing Knowledge and Information in BIM Implementation Processes in the Czech Republic,” MATEC Web of Conferences, vol. 146, pp.1-6, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Olufolahan Oduyemi, Michael Iheoma Okoroh, and Oluwaseun Samuel Fajana, “The Application and Barriers of BIM in Sustainable Building Design,” Journal of Facilities Management, vol. 15, no. 1, pp. 15-34, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Chukwuka Christian Ohueri, Wallace Imoudu Enegbuma, and Russell Kenley, “Energy Efficiency Practices for Malaysian Green Office Building Occupants,” Built Environment Project and Asset Management, vol. 8, no. 2, pp. 134-146, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Iyiola Oladehinde Olaseni, “Optimizing Construction Project Delivery using BIM for Real-time Design, Scheduling, and Cost Integration,” International Journal of Science and Research Archive, vol. 7, no. 2, pp. 759-776, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - Ochuko Felix Orikpete, Samuel Ikemba, and Daniel Raphael Ejike Ewim, “Integration of Renewable Energy Technologies in Smart Building Design for Enhanced Energy Efficiency and Self-Sufficiency,” The Journal of Engineering and Exact Sciences, vol. 9, no. 9, pp. 1-13, 2023.
[CrossRef] [Google Scholar] [Publisher Link] - Ayman Ahmed Ezzat Othman, and Lamis Yasser Wagih Youssef, “A Framework for Implementing Integrated Project Delivery in Architecture Design Firms in Egypt,” Journal of Engineering, Design and Technology, vol. 19, no. 3, pp. 721-757, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Idris Othman et al., “The level of Building Information Modelling (BIM) Implementation in Malaysi,” Ain Shams Engineering Journal, vol. 12, no. 1, pp. 455-463, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Seong Mok Paik et al., “Making most of BIM in Design: Analysis of the Importance of Design Coordination,” International Journal of Construction Management, vol. 22, no. 12, pp. 2225-2233, 2022.
[CrossRef] [Google Scholar] [Publisher Link] - Alan Patching et al., “Case Study of the Collaborative Design of an Integrated BIM, IPD and Lean University Education Program,” International Journal of Construction Management, vol. 24, no. 7, pp. 799-808, 2024.
[CrossRef] [Google Scholar] [Publisher Link] - Poorang Piroozfar et al., “Facilitating Building Information Modelling (BIM) using Integrated Project Delivery (IPD): A UK Perspective,” Journal of Building Engineering, vol. 26, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Xiaodie Pu et al., “Dependence Structure, Relational Mechanisms and Performance: Teasing out the Differences between Upstream and Downstream Supply Chain Partners,” International Journal of Operations & Production Management, vol. 43, no. 7, pp. 1009-1039, 2023.
[CrossRef] [Google Scholar] [Publisher Link] - Dean Reed et al., “Integrating Delivery of a Large Hospital Complex,” Proceedings of the 25th Annual Conference of the International Group for Lean Construction, Heraklion, Greece, pp. 201-208, 2017.
[CrossRef] [Google Scholar] [Publisher Link] - Ran Ren, and Jiansong Zhang, “A New Framework to Address BIM Interoperability in the AEC Domain from Technical and Process Dimensions,” Advances in Civil Engineering, vol. 2021, pp. 1-17, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Melissa L. Rethlefsen et al., “PRISMA-S: An Extension to the PRISMA Statement for Reporting Literature Searches in Systematic Reviews,” Systematic Reviews, vol. 10, pp. 1-19, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Modar Saad, Shukri Baba, and Omar Amoudi, “A Suggested Solution to Improve the Traditional Construction Planning Approach,” Jordan Journal of Civil Engineering, vol. 9, no. 2, pp. 185-196, 2015.
[Google Scholar] [Publisher Link] - Mahdi Swadi Salim, and Ahmed Mohammed Raoof Mahjoob, “Integrated Project Delivery (IPD) Method with BIM to Improve the Project Performance: A Case Study in the Republic of Iraq,” Asian Journal of Civil Engineering, vol. 21, pp. 947-957, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Mahdi S. Salim, and Ahmed Mohammed Raoof Mahjoob, “Achieving the Benefits and Requirements of Integrated Project Delivery Method Using BIM,” IOP Conference Series: Materials Science and Engineering, Baghdad, Iraq, vol. 901, pp. 1-12, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Luís Sanhudo et al., “BIM Framework for the Specification of Information Requirements in Energy-related Projects,” Engineering, Construction and Architectural Management, vol. 28, no. 10, pp. 3123-3143, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Ryan Solnosky et al., “IPD and BIM–Focused Capstone Course Based on AEC Industry Needs and Involvement,” Journal of Professional Issues in Engineering Education and Practice, vol. 140, no. 4, 2013.
[CrossRef] [Google Scholar] [Publisher Link] - Guiliang Su et al., “Risk Sharing Strategies for IPD Projects: Interactional Analysis of Participants’ Decision-Making,” Journal of Management in Engineering, vol. 37, no. 1, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Herdimas, Mokh Suef, and A.A.B Dinariyana, “Productivity Improvement through Energy Efficiency Training in Manufacturing Industry,” 2024 IEEE International Symposium on Consumer Technology (ISCT), Kuta, Bali, Indonesia, pp. 688-694, 2024.
[CrossRef] [Google Scholar] [Publisher Link] - Chengshuang Sun, Hanting Xu, and Shaohua Jiang, “Understanding the Risk Factors of BIM Technology Implementation in the Construction Industry: An Interpretive Structural Modeling (ISM) Approach,” Engineering, Construction and Architectural Management, vol. 27, no. 10, pp. 3289-3308, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - S. Theißen et al., “BIM Integrated Automation of Whole Building Life Cycle Assessment using German LCA Data Base ÖKOBAUDAT and Industry Foundation Classes,” IOP Conference Series: Earth and Environmental Science, vol. 588, no. 3, pp. 1-10, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Gabriel Tudora et al., “The Mixed Virtual/Real Matrix for Workspaces: A Mediating Solution between Remote and On-Site Working,” International Journal of Manufacturing Economics and Management, vol. 4, no. 2, pp. 49-64, 2024.
[CrossRef] [Google Scholar] [Publisher Link] - Usman Aminu Umar et al., “4D BIM Application in AEC Industry: Impact on Integrated Project Delivery,” Research Journal of Applied Sciences, Engineering and Technology, vol. 10, no. 5, pp. 547-552, 2015.
[CrossRef] [Google Scholar] [Publisher Link] - Marina L. Viana et al., “Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study,” Journal of Engineering, Project, and Production Management, vol. 10, no. 2, pp. 147-161, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Yongqi Wang et al., “Collaborative Relationship Discovery in BIM Project Delivery: A Social Network Analysis Approach,” Automation in Construction, vol. 114, 2020.
[CrossRef] [Google Scholar] [Publisher Link] - Jianguo Wei et al., “The Integration of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) in Industrial Buildings: Evidence from China,” Journal of Computational Methods in Science and Engineering, vol. 21, no. 6, pp. 1711-1726, 2021.
[CrossRef] [Google Scholar] [Publisher Link] - Seoung-Wook Whang, Kenneth Sungho Park, and Sangyong Kim, “Critical Success Factors for Implementing Integrated Construction Project Delivery,” Engineering, Construction and Architectural Management, vol. 26, no. 10, pp. pp. 2432-2446, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Joseph A. Wright, “The Integration of Building Information Modeling and Integrated Project Delivery into the Construction Management Curriculum,” 2012 ASEE Annual Conference & Exposition, San Antonio, Texas, pp. 1-14, 2012.
[CrossRef] [Google Scholar] [Publisher Link] - Reza Zaker, and Eloi Coloma, “Virtual Reality-integrated Workflow in BIM-enabled Projects Collaboration and DESIGN Review: A CASE Study,” Visualization in Engineering, vol. 6, pp. 1-15, 2018.
[CrossRef] [Google Scholar] [Publisher Link] - Maria-Angeliki Zanni, Robby Soetanto, and Kirti Ruikar, “Defining the Sustainable Building Design Process: Methods for BIM Execution Planning in the UK,” International Journal of Energy Sector Management, vol. 8, no. 4, pp. 562-587, 2014.
[CrossRef] [Google Scholar] [Publisher Link] - Gali A. Zarewa, “Barriers to Effective Stakeholder Management in the Delivery of Multifarious Infrastructure Projects (MIPs),” Journal of Engineering, Project & Production Management, vol. 9, no. 2, pp. 85-96, 2019.
[CrossRef] [Google Scholar] [Publisher Link] - Xin Zhang et al., “Experimental Study on Seismic Performance of Shear Wall with Precast Concrete Hollow Molds,” Structural Concrete, vol. 22, no. 3, pp. 1445-1461, 2021 .
[CrossRef] [Google Scholar] [Publisher Link] - Xianbo Zhao, Peng Wu, and Xiangyu Wang, “Risk Paths in BIM Adoption: Empirical Study of China,” Engineering, Construction and Architectural Management, vol. 25, no. 9, pp. 1170-118, 2018.
[CrossRef] [Google Scholar] [Publisher Link]