Risk Management and Analysis in Hydro-Electric Projects in India
International Journal of Civil Engineering |
© 2018 by SSRG - IJCE Journal |
Volume 5 Issue 3 |
Year of Publication : 2018 |
Authors : Sonia Sharma, Shantu Kar |
How to Cite?
Sonia Sharma, Shantu Kar, "Risk Management and Analysis in Hydro-Electric Projects in India," SSRG International Journal of Civil Engineering, vol. 5, no. 3, pp. 1-7, 2018. Crossref, https://doi.org/10.14445/23488352/IJCE-V5I3P101
Abstract:
Risks are very common in the construction of hydroelectric projects as hydro projects are very complex structures. Hydroelectric projects are susceptible to various technical, socio-political, construction and environmental risks. The track record of construction industry to deal with these risks has not been very good. This paper deals with identification of different risk factors and analyzing various risks involved in hydroelectric projects.Responses were collected from experts in different organizations through questionnaire survey and then collected data were analyzed to rank the different risk factors depending on their probability and impact to the hydroelectric projects. Main contributing risk factors in hydroelectric projects include land acquisition problems, resettlement & rehabilitation, flooding, complexity of project, non-availability of hydrological data.
Keywords:
Risk, Risk Management, Construction, Hydro-electricProjects.
References:
1. Borge, D. (2001). “The book of risk”, John Wiley & Sons.
2. Al-Bahar, J. F. and Crandall, K. C. (1990). “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, ASCE, 533-546.
3. Akintoye, A. S. and MacLeod, M. J. (1997). “Risk analysis and management in construction.” International Journal of Project Management, Vol. 15, 31-38.
4. Minato, T. and Ashley, D. B. (1998). “Data-driven analysis of “Corporate Risk” using historical cost-control data.” Journal of Construction Engineering and Management, ASCE, 42-47.
5. Mak, S. and Picken, D. (2000). “Using risk analysis to determine construction project contingencies.” Journal of Construction Engineering and Management, ASCE, 130-136.
6. Barber, R. B. (2005). “Understanding internally generated risks in projects.” International Journal of Project Management, 584-590.
7. Kansal, R. K. and Sharma, M. (2012). “Risk assessment methods and application in the construction projects.” International Journal of Modern Engineering Research (IJMER), Vol. 2, 1081-1085.
8. Mahendra, P. A., Pitroda, J. R. and Bhavsar, J. J. (2013). “A study of risk management techniques for construction projects in developing countries.” International Journal of Innovative Technology and Exploring Engineering, ISSN: 2278-3075, Vol. 3, 139-142.
9. Patel, K. (2013). “A study on risk assessment and its management in India.” American Journal of Civil Engineering, 64-67.
10. Tixier, A. J. P., Hallowell, M. R., Albert, A., Boven, L. and Kleiner, B. M. (2014). “Psychological antecedents of risk-taking behavior in construction.” Journal of Construction Engineering and Management, ASCE, 1-10.
11. Patel, G. P. and Singhal S. (2015). “Perception and management of risk in hydropower projects.” International Conference on Hydropower for Sustainable Development, 331-338.
12. Dharampalan, V., Gambatese, J. A., Fradella, J. and Vahed, A. M. (2015). “Quantification and assessment of safety risk in the design of multistory buildings.” Journal of Construction Engineering and Management, ASCE, 1-9.
13. Barry, W., Leite, F. and O’Brien, W. J. (2015). “Late deliverable risk catalog: evaluating the impacts and risks of late deliverables to construction sites.” Journal of Construction Engineering and Management, ASCE, 1-9.
14. Shaikh, M. M. (2015). “Risk management in construction projects.” International Journal of Current Engineering and Scientific Research (IJCESR), Vol. 2, 150-155.
15. Choubey, A. (2015). “Mitigation of hydro project development risk insurance need.” International Conference on Hydropower for Sustainable Development, 405-409.
16. Naderpajouh, N., Hastak, M., Gokhale, S., Bayraktar, M. E., Iyer, A. and Arif, F. (2015). “Counterfeiting risk governance in the capital projects supply chain.” Journal of Construction Engineering and Management, ASCE, 1-11.