Delay Analysis of Flyover Bridge Construction Using Primavera

International Journal of Civil Engineering
© 2019 by SSRG - IJCE Journal
Volume 6 Issue 5
Year of Publication : 2019
Authors : Dilip Kumar E, Manishankar S
pdf
How to Cite?

Dilip Kumar E, Manishankar S, "Delay Analysis of Flyover Bridge Construction Using Primavera," SSRG International Journal of Civil Engineering, vol. 6,  no. 5, pp. 1-5, 2019. Crossref, https://doi.org/10.14445/23488352/IJCE-V6I5P101

Abstract:

Delay is the most common problem in the construction industry. Project Scheduling and delay analysis became an important part of any project to complete the project among the planned time and cost. The application of the construction schedule to predict the project completion time. Delay in completion of the project can increase the price of the project. Small projects will be managed with efficiency manually, whereas massive projects aren't; therefore, massive projects will be better handled using computers. This junction multinumber of the software package is offered with the assistance of that project management. In bridge construction, different resources are needed for execution and also the risk is also added during this form of projects. So, planning and scheduling is an important task in massive projects. In our project, an attempt is created to schedule and delay analysis of varied activities concerned in flyover bridge construction in Salem district, Tamilnadu, using Primavera Software. The Flyover bridge is 8111m in length, and it's scheduled for 988 days. The construction unit's primary goal is to complete the work as specified on schedule with correct utilization of all the resources like man power, materials, cash, and machinery. To achieve the above goal is to execute the project most economically better in terms of money and time. This study's main objective is to analyse the delays in constructing flyover bridges and control the time loss and cost manipulation of the project.

Keywords:

Delay analysis, Flyover Bridge, Primavera, Time and Cost

References:

[1] Abdulaziz A. Bubshait and Michael J. Cunningham., Comparison of delay analysis methodologies, Journal of Construction Engineering and Management, (1998),315-322.
[2] Abdalla M. Odeh and Hussaien T. Battaineh, Causes of Construction delay: traditional contracts, International Journal of Project Management, PERGAMON,20, (2002),67-73.
[3] Sadi A. Assaf and Sadiq Al-Hejji, Causes of delay in large construction projects, International Journal of Project Management, ELSEVIER, 24, (2006),349-357.
[4] Aswathi R and Ciby Thomas, Development of a Delay Analysis System for a Railway Construction Project, International Journal of Innovative Research in Science, Engineering and Technology, ICEE, 2(1),(2013),531-541.
[5] MuraliSambasivan and Yau Wen Soon, Causes and Effects of Delays in the Malaysian construction industry, International Journal of Project Management.,25, (2007),517-526.
[6] M.E. Abd El-Razek, H.A. Bassioni, and A.M. Mobarak, Causes of delay in Building Construction Projects in Egypt, Journal of Construction Engineering and Management, ASCE.,(2008), 831- 841.
[7] B. Indhu and P. Ajai., Study of Delay Management in a Construction Project – A Case Study, International Journal of Emerging Technology and Advanced Engineering, 4(5), (2014),108 – 113.
[8] Keval J. Shah and Prof. M. R. Apte, Causes of Delay in Construction of Bridge Girders, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 12(1), (2015), 08-12.
[9] SreeLekshmi A and Vishnu Unnikrishnan., Planning and Delay Analysis of a Residential Complex: A Case Study, International Journal of Civil Engineering and Technology, 9(6),(2018),1191-1201.